top of page

Towamencin Public Pool

Design Theory: Lansdale Township needed to replace their competition pool that was worn out.  To ensure that the pool would not need maintenance for years to come, they chose to install a PVC clad stainless steel structure.  The pool was installed through the winter with a Memorial Day opening.

Completed: 2008

Location: Lansdale, Pennsylvania

Competition

Rairitain Valley Community College

Blanchburg, NJ

Completed 2005

Integrated Aquatics Engineering

75 Shewell Ave
Doylestown, PA 18901

Tele: (215) 230-8623

bottom of page